Numbers

0 2,265,879 Capacity |
0 Tanks
0 40.7 Draught |

About

LNG project
On 10 January 2024, Transnet National Ports Authority (TNPA) appointed the Vopak Terminal Durban & Transnet Pipelines consortium as the preferred bidder to develop and operate a liquefied natural gas terminal at the Port of Richards Bay in South Africa. Specifically, the consortium was appointed to design, develop, construct, finance, operate and maintain the LNG terminal in the South Dunes Precinct at the Port of Richards Bay for a period of 25 years. We strongly believe that the planned terminal (subject to FID) is set to change the economic dynamics of the port city, the KwaZulu Natal Province and introduce an alternative source of energy as South Africa battles an energy crisis and transitions towards decarbonization. For more information please visit: https://www.zululandenergyterminal.co.za/

Contact

Thembani Mazibuko

thembani.mazibuko@vopak.com +27 76 812 2745

Contact

Sphamandla Katangana

sphamandla.katangana@vopak.com

Contact

Mohamed Leach

mohamed.leach@vopak.com

Our Terms and Conditions
Vopak has drawn up general terms and conditions for the purchase of goods and / or services. Below you will find a number of documents that contain all conditions:
Part A
Part B
Part C
Part D

Facts

Tank types
Coated Steel, Mild steel, Stainless steel
Tank size
From 1,000 to 20,000 cbm
Access
Pipeline, Rail, Truck, Vessel
Products
Petroleum products, Chemicals, Oleochemicals
Services
Additivation, Dedicated systems
Terminal type
Import-Export-Distribution

Contact

Address
Vopak Terminal Durban
105 Taiwan Road 4052 Island View Bluff
Durban
South Africa

Phone +27 31 4669200